Connection set for flush-mounted installation
XXX.XX
€/unit
Description • Suitable for gas condensing boiler CGB-2K and boiler CGU-2K • Consisting of: - 1 x gas ball valve with TAS - 1 x straight maintenance tap with fill and drain valve - 1 x straight maintenance tap with fill and drain valve and connection for safety valve DN 15 (1/2”) - 1 x hot water connector - 1 x cold water connector - 1 x safety valve (response pressure: 3 bar) - 1 x drain funnel Technical data
|
Products |